Find Jobs
Find Jobs Near You – Available Work in Your Location
Skip to job details
BV
BUREAU VERITAS NORTH AMERICA
SKILLBRIDGE - ACTIVE DUTY MILITARY ONLY: Commissioning Engineer (CxA)
Career Insights for Operating Engineer / Heavy Equipment Operator
See where this job fits in the broader career landscape. Knowing your career path helps you see what's possible from here.
Scorecard
Based on Texas data
Review key factors to help you decide if this role fits your goals. How is this calculated?
What they do
An Operating Engineer or Heavy Equipment Operator drives and operates heavy equipment used in quarries, construction sites, landfills, refuse and recycling centers, or ports. Heavy Equipment may include, but is not limited to, bulldozers, excavators, paving equipment and pile drivers.
$53,887 / year median in Texas
+14% projected growth
Job Description
Mission Critical
- Bureau Veritas North America The Role and Responsibility of a Cx Engineer in Data Center Commissioning Core Purpose The Commissioning (CxA) Authority is a third-party firm hired to represent the client.
- those responsibilities stay with the contractor, vendor, or Engineer of Record (EOR).
The on-site commissioning team includes:
The General Contractor The equipment vendors The mechanical or electrical contractor TheBMS/EPMS
vendor The CxA's responsibilities include: Organizing and leading the team Preparing and updating the Commissioning Plan Verifying design documents align with Owner's Project Requirements (OPRs) Defining testing requirements Maintaining an Issues Log to capture deviations Conducting tests, documenting outcomes Preparing the final Commissioning Process Report and Systems Manual Recommending system acceptance to the owner 2. Issue Identification and Tracking Capture problems in an issues log Follow through until resolution Ensure each item is closed by the responsible party 3. Safety and Load Protection Maintain safety standards and never allow tests to endanger staff, equipment, or live load 4. Objective Reporting Report findings factually and transparently to owners, contractors, and vendors Stay impartial — advocate only for the facility's operational reliability. What a Cx Engineer Is Not Responsible For 1. Correcting Issues Cx engineers do not repair, rewire, or adjust systems Responsibility for correcting deficiencies lies with vendors, contractors, or installers 2. Altering Design If a test exposes a design flaw, the solution belongs to the EOR 3. Operating Equipment Cx engineers do not operate or take ownership of systems They may direct or witness vendors performing actions during tests, but they do not manipulate equipment themselves 4. Owner's Business Decisions Budget, schedule, or contractual impacts remain outside the Cx engineer's role Their authority is technical, not financial Industry Standards Backing This philosophy is not just opinion- it is reinforced by multiple professional associations and standards bodies: ASHRAE
- Guideline 0 and Standard 202 define commissioning as a quality-focused process of evaluation and documentation to verify that systems meet the Owner's Project Requirements (OPRs). The Cx Authority plans, tests, and reports
- but does not correct or redesign. BCxA (Building Commissioning Association)
- Positions the Cx professional as the owner's advocate, responsible for impartial verification and documentation. Their code of ethics emphasizes independence and neutrality. ACG (AABC Commissioning Group)
- In their Guidelines for Total Building Commissioning, ACG defines the Cx role as ensuring systems are installed and function per OPRs, with corrections belonging to contractors and vendors. NEBB (National Environmental Balancing Bureau)
- Through certification programs, NEBB reinforces that commissioning professionals test and validate systems, but installation and correction remain the contractor's responsibility.
USGBC / LEED
- Commissioning is required for certification, and the CxA must be independent of design and construction teams. The CxA verifies and documents, while designers and contractors correct deficiencies. Uptime Institute (Data center-specific)
- Their Tier Certification of Constructed Facility (TCCF) process depends on commissioning to prove redundancy and resiliency. The Cx team's role is to verify Tier compliance
- not to alter equipment or correct vendor work.