Skip to main content
Tallo logoTallo logo

Find Jobs

Find Jobs Near You – Available Work in Your Location

Skip to job details

Back to Results

Apply for this opportunity

To apply for this job, you'll continue to an external website or email application.

Green Tanner Industrial

Electrical Workface Planner

Career Insights for Engineering Project Manager

See where this job fits in the broader career landscape. Knowing your career path helps you see what's possible from here.

Scorecard

Based on Arizona data

Review key factors to help you decide if this role fits your goals. How is this calculated?

Were these scores useful?

What they do

An Engineering Project Manager oversees and leads execution of engineering projects, and manages communication and coordination among different types of engineers working on a project. Supervises project schedule, budget, and communications with stakeholders.

$141,745 / year median in Arizona

+13% projected growth

Explore Career

Job Description

Electrical Workface Planner Green Tanner Industrial
  • 5.
0 Chandler, AZ Job Details Full-time 21 hours ago Benefits Health insurance Dental insurance Vision insurance 401(k) matching Qualifications Project team coordination Cable systems installation Electrical blueprint reading Construction specifications Electrical cable pulling Operations coordination planning Industrial electrical equipment installation projects Driver's License Construction plans Construction drawing review Field engineering equipment installation Productivity software Project planning phase Cross-functional communication Full Job Description 1) Purpose of Role The Electrical Workface Planner (WFP) supports the execution of Green Tanner Industrial Construction's (GTI) field operations by developing and maintaining Installation Work Packages (IWPs) that enable safe, efficient, and predictable electrical installation. This role bridges preconstruction planning and field execution by ensuring crews are provided with complete, constraint-free, and installation-ready work packages. The WFP contributes to GTI's implementation of Advanced Work Packaging (AWP) by organizing scope into logical, executable sequences aligned with the Path of Construction (PoC). This position works closely with Preconstruction, QA/QC, Procurement, and Field Supervision to improve productivity, reduce rework, and enhance overall project delivery. 2)
Scope & Decision Rights Owns:
Development and maintenance of Installation Work Packages (IWPs), including scope breakdown, sequencing, and inclusion of all required construction inputs (drawings, materials, tools, safety, and quality requirements).
Supports:
Preconstruction planning, constructability reviews, materials coordination, QA/QC planning, and field execution strategies aligned with AWP principles.
Recommends/Prepares:
IWP templates, workface planning standards, constraint tracking logs, and process improvements to support GTI's evolving AWP program.
Escalates:
Identified constraints, including missing engineering, unavailable materials, access limitations, or sequencing conflicts, to the Project Manager, Superintendent, or Preconstruction leadership. 3) Essential Duties and Standards Develop and maintain Installation Work Packages (IWPs) for electrical scopes, including duct banks, conduit systems, cable installation, terminations, and equipment setting. Break down project scope into logical, executable work steps aligned with field sequencing and Path of Construction (PoC). Ensure IWPs include all required components, including drawings, material lists, tools and equipment, safety requirements, and quality inspection checkpoints. Coordinate with Procurement and Materials Management to verify material availability prior to IWP release. Collaborate with QA/QC to incorporate inspection and test requirements into IWPs. Interface with Superintendents and Foremen to validate constructability, sequencing, and usability of work packages. Track and maintain IWP status, including readiness, release, and field progress updates. Identify and communicate constraints impacting execution, including engineering, materials, access, and permitting. Support alignment of Construction Work Packages (CWPs), Engineering Work Packages (EWPs), and IWPs. Participate in planning and coordination meetings with internal teams and trade partners. Maintain organized documentation within project platforms such as Procore or ACC. Contribute to the continuous improvement of GTI's Workface Planning and AWP processes. 4) Critical Competencies (must demonstrate) Strong understanding of electrical construction practices, including conduit installation, cable routing, and equipment installation. Ability to interpret construction drawings, specifications, and installation details. Working knowledge or exposure to Advanced Work Packaging (AWP) and Workface Planning (WFP) principles. Strong organizational and planning skills with the ability to break down complex scope into actionable work steps. Attention to detail to ensure IWPs are complete, accurate, and field-ready. Effective communication skills to coordinate between office and field teams. Proficiency in digital tools, including Bluebeam, Microsoft Office, and construction management platforms (Procore, ACC). Problem-solving mindset focused on identifying and mitigating execution constraints. 5) Qualifications Minimum of 3 years of construction experience, preferably within electrical or industrial construction. Field experience with electrical installation methods, including underground, conduit, and equipment work. Basic familiarity with construction sequencing and planning processes. Exposure to AWP, Workface Planning, or similar planning methodologies preferred but not required. Ability to read and interpret construction drawings and specifications. Experience with construction software tools such as Bluebeam, Excel, and document management systems. Valid driver's license and ability to travel to project sites as required. 6) Performance Measure Buckets Work Package Readiness
  • Percentage of IWPs released with all required inputs (drawings, materials, constraints cleared). Field Productivity Support
  • Reduction in delays, rework, and interruptions due to incomplete or missing information. Constraint Management
  • Identification and timely resolution of constraints impacting planned work. Documentation Quality
  • Accuracy and completeness of IWPs and associated records within project systems. Process Development
  • Contribution to the development and improvement of GTI's AWP/WFP standards and templates. Team Coordination
  • Effectiveness in supporting communication and alignment between Preconstruction, QA/QC, Procurement, and Field teams.
7) Employee Benefits 401(k) with company match 100% employer-paid medical insurance (employee-only coverage) Dental and Vision insurance Sick Time