Skip to main content
Tallo logoTallo logo

Find Jobs

Find Jobs Near You – Available Work in Your Location

Skip to job details

Back to Results

Apply for this opportunity

To apply for this job, you'll continue to an external website or email application.

Staff Resources, Inc.

Industrial Engineer - 0015

Review key factors to help you decide if the role fits your goals.
Pay Growth
?
out of 5
Not enough data
Not enough info to score pay or growth
Job Security
?
out of 5
Not enough data
Calculating job security score...
Total Score
70
out of 100
Average of individual scores

Were these scores useful?

Job Description

Position Duties:
Field check current WITS documenting detailed equipment in each station including nut runners, controllers, scanners, tool rails, material racks, platforms etc. Attend WITS deep dives for process changes for new model and documenting moves of all equipment to future locations Work with Execution ME's to obtain the future tooling required for the new model Document all new tooling in all production stations Print equipment labels for all facility equipment being relocated, abandon in place, remaining in place, Demolition Manage labeling of all equipment in the future process stations During shut down manage and document future equipment in each production station for new model process Maintain WITS and document changes during pilot builds to new process
Skills and Experience Required:
Automotive Experience is a plus Previous Industrial/Manufacturing/LMS engineering experience. Knowledgeable in Lean Material Strategy/Kitting principles. Must know AutoCAD; FactoryCad knowledge is preferred. Must be a team player, pro-active and be able to perform under limited supervision. FactoryCad Engineering Develop layouts for the kitting/sequencing areas. Work with the plant IEs, tech center IEs, IT (for pick lights, scannerstablets), team leaders and contractors. Develop kitting areas based on part information and usage from the PFEP. (Plan For Every Part) Possible involvement/input in the design of kitting carts. Develop execution drawings and WITS (Workstation Installation Tracking Sheet). Verify the installed items match the layouts, if not - update drawings to as-built state. Perform field checks for interferences and check original drawing accuracy.
Drawings Typically Include:
Material (container size, part number, qty., usage, etc.) Material presentation (dolly, flow rack, riser, lift/tilt table) Material stops (angle iron on floor to keep material from being pushed into the kitting cell) Material signs (conduit for hanging it from) High bay racks Lighting Utilities requirements (Ethernet, device net, power, air, FRL) Scanner, HMI, printer, pick light (location) Cable trays Sub assembly tables (location) AGC paths Operator workstations (table, trash, etc.) Empty container/dunnage (location) Lift assists Operator Fans (in some cases)

Benefits

  • Dental Insurance