Drain Line Repipe 5 Fixtures Position Available In Shelby, Tennessee

Tallo's Job Summary: The job entails repiping drain lines for 5 fixtures at the University of Minnesota. Tasks include removing old piping, installing new Schedule 40 PVC lines for toilets, tubs, washers, and sinks, maintaining proper slope and support, tying into the main sewer line, venting fixtures, and performing tests. Compensation is based on submitted bids.

Company:
Unclassified
Salary:
JobFull-timeOnsite

Job Description

⚐ ⚑ ⚑ Drain Line Repipe – 5 Fixtures (U of M) ‹ image 1 of 1 › Semmes near Park compensation: Submit Bid Work to Be Performed Remove all existing drain piping from the fixtures to the main line Dispose of old materials off-site (unless otherwise requested) 2. Install New Drain Lines (Schedule 40 PVC)

Toilet:

3″ line Tub +

Washer:

2″ lines

Sinks:

1.5″ or 2″ depending on layout

Main Drain Trunk:

3″ (minimum), 4″ preferred if tying into older cast iron or city tap Maintain 1/4″ per foot slope Support with straps/hangers every 4 feet (code) Tie into existing main sewer line under house or within 5 ft of foundation 3. Venting Tie all fixtures are tied into existing vent stack or use AAVs where permitted (except toilet — must be traditionally vented) 4. Test and Finish Perform leak test or water flow check Leave crawlspace tidy, strap pipes securely, and provide brief walkthrough or photos post id: 7850845537 updated: ♥ [ ]

Other jobs in Shelby

Other jobs in Tennessee

Start charting your path today.

Connect with real educational and career-related opportunities.

Get Started